Canam's Railway Gantry Crane System: The Way to Install Railway Bridges Faster
With over 50 years of experience in designing, fabricating and erecting steel bridges, Canam's engineers are developing a state-of-the-art solution to replace railway spans in record time.
Replace spans within 6 hours
The Canam Railway Bridge Gantry System will provide stability, speed, and precision as an alternative to conventional mobile cranes.
|
|
This system will be able to remove an entire railway span, including deck, and replace it with a new span within six hours with absolutely no impact on the environment.
Overall, it will provide a safer alternative than conventional replacement methods and will be delivered to job sites (even those with limited access) and mobilized within days.
Advantages
- Safer operation than other methods
- No environmental impact
- System delivered to site and mobilized within days
- Ideal for sites with restricted access
Visit Canam-Bridges at Railway Interchange 2017, September 17-20, booth #3575
|