Railway Interchange 2017
Railway Interchange 2017 | September 17-20 | Indianapolis, IN

Canam's Railway Gantry Crane System: The Way to Install Railway Bridges Faster

With over 50 years of experience in designing, fabricating and erecting steel bridges, Canam's engineers are developing a state-of-the-art solution to replace railway spans in record time.

Replace spans within 6 hours
The Canam Railway Bridge Gantry System will provide stability, speed, and precision as an alternative to conventional mobile cranes.

Railway Interchange 2017

Set-Up

This system will be able to remove an entire railway span, including deck, and replace it with a new span within six hours with absolutely no impact on the environment.

Overall, it will provide a safer alternative than conventional replacement methods and will be delivered to job sites (even those with limited access) and mobilized within days.

    Advantages
  • Safer operation than other methods
  • No environmental impact
  • System delivered to site and mobilized within days
  • Ideal for sites with restricted access


Visit Canam-Bridges at Railway Interchange 2017,
September 17-20, booth #3575